Consulting for the logistic plant development

AstraZeneca GmbH

Company

Services from IWL

  • Location finding
  • Development concept
  • Building development

Customer benefit

  • Creation of the required storage capacity
  • GDP / GSP compliant logistics processes
  • Integration of the production expansion into the existing building structure

Task description

  • Conversion of the truck loading zone, expansion of the transport corridor between production and logistics
  • Location determination for the expansion of the packaging
  • Possibilities for warehouse and shipping expansion
  • Optimization of the flow of goods between production and logistics according to GMP criteria

Industry Health / Chemistry / Cosmetics

Project location Plankstadt

Project duration 5 years (1999 – 2004)

Special features construction height: approx. 16 m

Area Versanderweiterung: ca. 600 m²

Capacity HRL Stapler bedient: ca. 2.700 Stellplätze; HRL autom. 6.000 Stellplätze

Industry Health / Chemistry / Cosmetics

Project location Plankstadt

Project duration 5 years (1999 – 2004)

Special features construction height: approx. 16 m

Area Versanderweiterung: ca. 600 m²

Capacity HRL Stapler bedient: ca. 2.700 Stellplätze; HRL autom. 6.000 Stellplätze